Shower remodel
Tiled walk-in shower
A tiled walk-in shower built with our full waterproofing sequence, finished with a glass enclosure and a recessed niche.

Location
The Triangle, NC
Project type
Bathroom remodel
On site
5 to 6 weeks
A complete bathroom rebuild covering framing, plumbing, electrical, tile, vanity, countertop and glass.
A full bathroom runs in sequence: framing, plumbing, electrical and HVAC, inspections, then drywall, tile preparation and grouting, vanities, countertop and glass templating, paint, trim and fixtures.
Because custom glass is fabricated after templating and installed two to three weeks later, we quote these honestly at five to six weeks rather than the three weeks the tile work alone might suggest.
“I walked in unsure about my bathroom remodel, but The Bath Shop exceeded every expectation. The quality of the work is evident in the flawless tile work and the perfectly fitted shower.”
Every project on this page was measured, made and installed by the same team.

Shower remodel
Tiled walk-in shower
A tiled walk-in shower built with our full waterproofing sequence, finished with a glass enclosure and a recessed niche.

Tub to shower conversion
Tub to shower conversion
An unused guest bathtub replaced with a walk-in shower, reframed and re-plumbed rather than tiled over.